3D visualization of ground conditions based on boring data
Disaster prevention planning for road, railway and tunnel
Slit type SABO dam
Impermeable type SABO dam
CLIENT | PROJECT | YEAR |
---|---|---|
MLIT Kinki Regional Development Bureau, Wakayama Office of River and National Highway | A hydro-geological survey of Kihoku- Nishi Highway | 2017 |
West Nippon Expressway Company Limited, Kasai Office | Shin-Meishin Ohtsu Office, A study of slope failure prevention works in Ohishi-Higashi area | 2016 |
West Nippon Expressway Company Limited,Shin-Meishin Otsu Construction Office of Kasai Office | A second detailed geotechnical survey in Oishi-higashi and Oishi-naka area,Shin-Meishin Expressway | 2015 |
MLIT Kinki Regional Development Bureau,Osaka Office of National Highway | A study of measures for road disaster prevention | 2015 |
Nara Prefectural Government, Uda Construction Office | Survey and design of SABO dam for revival from disaster in Hataidani area | 2012 |
[Head Office]
4-11-10,Higashinakajima HigashiYodogawa-ku,Osaka,533-0033,JAPAN
TEL:+81-6-6160-1227
FAX:+81-6-6160-1239
[Tokyo Head Office]
2-10-13,Kojimachi,Chiyoda-ku,Tokyo,102-0083,JAPAN
TEL:+81-3-3511-2002
FAX:+81-3-3511-2032
We estimate ground conditions of the future through the examination of the past and present
When developing and maintaining infrastructure, we first have to know about ground conditions. We obtain a picture of the “past” and assess ”existing” conditions by utilizing basic technology such as site reconnaissance, and geotechnical survey and measurement, and predict the “future” using various analysis techniques. We also contribute to create a safe and secure society through our geotechnical skills.