Simulation of tunnel facing by three dimensional analysis
Twin large section tunnels with low-overburden
Comparison of tunnel entrance by Construction Information Modeling
CLIENT | PROJECT | YEAR |
---|---|---|
MLIT Tohoku Regional Development Bureau, Sakata Office of River and National Highway | A detailed design of tunnel in Wasada area and Koiwagawa area | 2016 |
MILT, Road Bureau | A study about standard of maintenance and management for road tunnel | 2016 |
MLIT Chubu Regional Development Bureau,Meishi Office of National Highway | A detailed design of Toyosawa tunnel, Gamagori BP | 2016 |
East Nippon Expressway Company Limited,Kanto Office | A detailed design of Shodo tunnel, Yokohama Circular South Highway | 2016 |
MLIT Kinki Regional Development Bureau,Hyogo Office of National Highway | A detailed design of Hachiman tunnel, Najio Road | 2011 |
[Head Office]
4-11-10,Higashinakajima HigashiYodogawa-ku,Osaka,533-0033,JAPAN
TEL:+81-6-6160-1227
FAX:+81-6-6160-1239
[Tokyo Head Office]
2-10-13,Kojimachi,Chiyoda-ku,Tokyo,102-0083,JAPAN
TEL:+81-3-3511-2002
FAX:+81-3-3511-2032
We solve difficult problems with considerable technical capabilities
As for mountain tunnels, projects are increasingly undertaken in urban areas, unfavorable mountain areas, and sites in close proximity to important facilities. Therefore, we respond to such difficult challenges by fully utilizing our sophisticated design technology. We also make propositions regarding asset management systems, effective use of natural energy and its conservation measures.